Building and pad preparation is an essential step in the construction process. It lays the foundation for a successful build and ensures that your structure is stable and safe. It’s a process we can help you with here at Smoot Contracting Group. 

But when you want to get started with this work, where do you begin? Here’s a guide to help you plan and execute the preparation of your building and pad.

Conduct a site survey

Before you begin any construction, it’s important to understand the lay of the land. Conduct a thorough site survey to identify potential issues, like drainage problems, soil types, and any existing structures that may need to be removed or incorporated into your build.

Obtain the necessary permits

Make sure to check with your local building department to ensure that you have all the necessary permits in place before beginning any construction. The last thing you want to do is start moving ahead and then get into trouble for doing so later. It’s not worth the risk.

Clear and level the site

Clear the site of any debris, brush, and trees. Then, use a grading tool to level the land to ensure that your building and pad have a solid foundation. You can’t move on and carry on any further work on the site until this vital part of the process has been completed.

Install utilities

Decide where you want to install water, electricity, and other essential utilities and have them connected before you begin to build. These are obviously important decisions to make before properly starting work on the building.

Compact the soil

Once the site is leveled, compact the soil using a roller or other compaction equipment. This will make sure that the soil is stable and able to support the weight of the building, ensuring its safety for a long time to come.

Prepare the subgrade

The subgrade is the layer of soil on which the foundation of your building will be placed. It should be graded, compacted, and smooth so that your foundation is stable and level. Getting this wrong could lead to serious problems with the foundations of the home later on, and that’s not what you want to have to deal with.

Build the pad

Once the subgrade is prepared, it’s time to build the pad. You can use different materials like concrete or asphalt for the pad, depending on the soil type, intended usage, and design of the building. That’s something you can discuss with the professionals.

By following these steps, you can make sure that your building and pad are prepared properly and that your construction project can proceed successfully. Don’t forget that good pad preparation also means less maintenance and fewer problems going forward.
It’s also important to work with a professional who has experience in building and pad preparation. That’s why you shouldn’t hesitate to get in touch with our team here at Smoot Contracting Group. We’ll be more than happy to discuss your project with you.